How to draw vertical lines in time reference curve
Hi Dewesoft Supporting team,
I want to draw vertical lines at specify point in recoder to mark the machine starting moment. I tried in time reference curve,how seems this math does not support verical line, the error indicated that "Axis values should be arranged in ascending order". And please see the image i attached, i want the "red vertical line" into the recorder and could be specify the time point flexibly, is it possible to do this in dewesoft ?
Thank you!
Best
Eric
Attached files:
Customer Support Engineer
Hi,
the time reference curve supports only the axis values in ascending order. You could create two samples with a difference of one sample to get a line at a certain time.
If these lines are added in the analysis, it is also possible to use user notes in the recorder to create a point.